Get webhook notifications whenever Network & Infrastructure creates an incident, updates an incident, resolves an incident or changes a component status.
We will migrate the router var-5-6k in a configuration \"on a stick\" by cutting the router already in place a nexus7706 (composed of a SUP2T + 4 * 6908).
This will allow us to connect the various ports on 100G backbone as well as to upgrade the exchange point TPIX 100G.
We will begin the migration tonight at midnight.
Update(s):
Date: 2015-05-27 08:47:44 UTC The nexus 7706 migration is complete. We're going to connect the 100G various links to the POP in Warsaw.
Date: 2015-05-27 08:42:58 UTC The router is isolated. Beginning the migration.
Date: 2015-05-27 08:42:42 UTC Starting by isolating the traffic on var-5-6k.