Get webhook notifications whenever Network & Infrastructure creates an incident, updates an incident, resolves an incident or changes a component status.
To improve the quality of our pni with Telstra a joint maintenance is in progress on this link.
Update(s):
Date: 2017-07-14 04:15:11 UTC We bring up the port to telstra and latency are ok now. Telstra have to check in an other DC the optical level, but it's will not impact the traffic
Date: 2017-07-14 03:24:41 UTC We are checking the optical level with Telstra
Date: 2017-07-14 02:46:37 UTC We will clean-up the fiber and change the optical module between Telstra and us. The trafic transiting through Telstra will be rerouted through LAX during the maintenance. We start to isolate the link
Date: 2017-07-12 07:10:01 UTC The operation have been postponed to friday 14/07/2017 same timeslot.