As a result to the problem that has been met on UPS 3 in Rbx2 (http://status.ovh.net/?do=details&id=1335),
we need to perform a maintenance on the rooms 20 and 25. The B track will be isolated on both
rooms. The dual alimentation of each server will keep the servers running.
We prepare the work and the operation should take place around 15h30 - 16h.
Update(s):
Date: 2011-05-05 08:43:20 UTC The maintenances on room 20 and 25 are finished.
Date: 2011-05-03 13:51:11 UTC The tasks on UPS 3 are finished.
We will benefit from these tasks in order to add an inverter on one of the channels of room
25. The channel A of the room 25 will be cut off from 13h30 till 17h.
The double power supply of each server will help maintaining the servers operational.
Date: 2011-04-15 14:26:38 UTC We start the maintenance.