Date: 2014-07-26 13:38:09 UTC Les liens sont up. Le trafic est rétabli
Date: 2014-07-26 08:22:06 UTC The Outside Plant Technician on site has advised that the line they were using to pull the slack fiber through the spare duct has broken with the slack fiber stuck in the spare duct. The repair crews on site are currently formulating a new plan moving forward to successfully and completely pull the slack fiber the full 2,000 feet, and have advised the next update will be issued at approximately 05:00 GMT.
Date: 2014-07-25 23:05:45 UTC The Transport NOC has advised that the construction crew on site continues to work to excavate the manhole that is 10 feet deep and have encountered a water line that has slowed progress as they have had to work around it. They are currently working to verify the spare ducts have not also been damaged, and have still been unable to provide an estimated time to begin splicing.
Date: 2014-07-25 20:07:38 UTC
Field Services have arrived at the site of the fiber cut, and is currently obtaining further information regarding the damage as well as formulating a repair plan to move forward with. Repair crews have been mobilized and have provided an estimated time of arrival of 20:45 GMT.
Date: 2014-07-25 19:50:48 UTC La coupure de fibre se situe à Tallahassee en Floride ce qui impacte les liens Newark < > Miami et Atlanta < > Miami
Date: 2014-07-25 19:48:04 UTC Message du fournisseur :
Status: Circuit is currently being affected by fiber cut in the Miami, FL area. Field services are engaged. No ETR at this time.
Date: 2014-07-25 19:30:50 UTC Nous avons également contacté notre fournisseur de fibre qui a un problème en Floride. Nous pensons que c'est lié.
Date: 2014-07-25 19:23:27 UTC Une équipe sur place est en train de diagnostiquer le problème.
Date: 2014-07-25 18:01:07 UTC Nous contactons le datacenter sur place.